Fire strategies, FRAEWs and Building Safety Act support – London, Berkshire and UK-wide

Cost guide · 2026

Fire safety report costs

What drives the cost of fire strategies, FRAEWs, EWS1 forms, safety case reports and fire risk assessments – with indicative market ranges where they're published.

  • Indicative 2026 ranges
  • Fixed fee before you commit
  • No surprise extras
  • Proposal within days

Request a proposal

Reply in 1 working day

Tell us about the building – we'll confirm what's needed and come back with a fixed-fee proposal.

We'll only use your details to respond to this enquiry and, where needed, share them with the specialist assigned to your project – see our privacy policy.

Prefer to talk? 020 8058 1692

  • Qualified specialists
  • Fixed-fee proposals
  • PAS 9980:2026 guidance
  • Higher-risk buildings
  • London & UK-wide

Indicative costs

Fees for fire safety work vary more than most people expect, because two buildings of similar size can need very different amounts of work. The ranges below are indicative market ranges published in 2026 – your proposal will always confirm a fixed fee for your building.

Service How it's usually priced Indicative range
FRAEW – low-rise block (up to 11m) Per building £1,500–£5,000
FRAEW – medium-rise block (11–18m) Per building £4,000–£12,000
FRAEW – high-rise block (18m+) Per building £8,000–£20,000+
EWS1 form Per building, based on an FRAEW Mostly the cost of the FRAEW
Fire door inspection Per door, with a minimum visit charge £25–£65 per door
Detailed fire door survey Per door £35–£80+ per door
Fire strategy report Per project Fixed fee after reviewing drawings
Retrospective fire strategy Per building Fixed fee after reviewing records
Safety case report Per building or portfolio Fixed fee after initial review
Fire risk assessment Per premises, by type Fixed fee after scoping
Compartmentation survey Per building or area Fixed fee after scoping
Fire safety due diligence Per transaction Fixed fee after seeing the asset list
Planning Gateway One fire statement Per scheme Fixed fee after reviewing the plans
Premises information box and plans Per building, by number of storeys Fixed fee after checking existing drawings
EV, solar PV or battery fire risk assessment Per installation or building Fixed fee after scoping
Cladding remediation support Fixed fee or fee scale Agreed before you commit; often fundable
Peer review of a report Per report Fixed fee for desktop reviews

Intrusive investigations, access equipment, laboratory testing and out-of-hours working are usually priced separately – your proposal will show them as separate items.

What drives the cost

  • Height and size – taller buildings need more inspection, more analysis and more senior sign-off
  • Complexity – mixed uses, unusual layouts, atria, phased evacuation or engineered solutions take longer
  • Information available – good drawings and records save survey and research time; missing records add it
  • Access – risers, roof voids, flats and high-level walls may need appointments, keys or access equipment
  • Competence required – higher-risk buildings require chartered or specifically qualified professionals
  • Timescale – urgent work for transactions or regulator deadlines may need extra resource

Why the cheapest quote can cost more

A fire safety report is only useful if it's accepted by the people who rely on it – the regulator, fire service, lenders, insurers and buyers. A low-cost report that's too generic, signed by someone without the right competence, or that misses key evidence can mean paying twice. Always check who will carry out and sign the work, and what the scope includes.

FAQs

Cost questions

Will the fee change once the work starts?

No – the fee in your proposal is fixed for the scope described. If something new is found that needs extra work, such as intrusive investigation, we'll agree it with you first.

Why can't you give an exact price on the website?

Because the same service can take a few days on one building and several weeks on another. A short look at the building's details lets us give you a firm figure.

Do you charge for a proposal?

No. Scoping the work and sending a fixed-fee proposal is free and there's no obligation to proceed.

Call Get a proposal