Fire strategies, FRAEWs and Building Safety Act support – London, Berkshire and UK-wide

Fire engineering · London & UK-wide

Fire strategy reports in London and the UK

Clear, defensible fire strategies for new buildings, refurbishments and changes of use – written by qualified fire engineers and ready for building control, the Building Safety Regulator and the people who will run the building.

  • New build, refurb & change of use
  • BS 9991 / BS 9999 / Approved Document B
  • Gateway 2 and building control ready
  • Fixed-fee proposal

London, plus Slough, Reading, Windsor & Maidenhead, Bracknell & Wokingham – and UK-wide.

Request a proposal

Reply in 1 working day

Tell us about the building – we'll confirm what's needed and come back with a fixed-fee proposal.

We'll only use your details to respond to this enquiry and, where needed, share them with the specialist assigned to your project – see our privacy policy.

Prefer to talk? 020 8058 1692

  • Qualified specialists
  • Fixed-fee proposals
  • PAS 9980:2026 guidance
  • Higher-risk buildings
  • London & UK-wide

What a fire strategy report does

A fire strategy explains how a building is designed to keep people safe in a fire and to support firefighting. It brings together the means of escape, the evacuation approach, fire detection and alarm, compartmentation, smoke control, structural fire resistance, external fire spread and access for the fire service – and shows how each one meets the relevant guidance or an engineered alternative.

It is the document building control, insurers, fire engineers and future managers return to when they need to know why the building is designed the way it is.

When you need one

  • Building control applications for new buildings, extensions and material alterations
  • Higher-risk buildings (at least 18m or 7 storeys with two or more residential units), where the fire strategy forms part of the Gateway 2 application to the Building Safety Regulator
  • Changes of use – for example office-to-residential conversions, HMOs, hotels and student accommodation
  • Refurbishments that affect escape routes, compartmentation, alarm systems or the evacuation strategy
  • Handover, where fire safety information must be passed to the responsible person on completion under Regulation 38 of the Building Regulations

For existing buildings with no usable strategy, see our retrospective fire strategy service.

How we approach it

Every strategy starts with the building's use, height and occupants. We identify the design guidance that applies – Approved Document B, BS 9991 for residential buildings or BS 9999 for other buildings – and agree early with the design team where an engineered solution may be better than a prescriptive one.

Where a design departs from guidance, the justification is set out clearly so building control and the regulator can follow the reasoning. Strategies are coordinated with the architect, M&E engineers and structural engineer so the drawings, specifications and strategy say the same thing.

Strategies by RIBA stage

  • Stage 2–3: an outline strategy that fixes the key decisions – stair numbers, evacuation approach, firefighting provisions – before the design is locked in
  • Stage 4: a detailed strategy for building control or the Gateway 2 application, with fire strategy drawings
  • Stage 5–6: design change reviews, site queries and a final as-built strategy for handover and the golden thread

What's included

  • Review of drawings, specifications and brief
  • Applicable guidance identified and agreed
  • Means of escape and evacuation strategy
  • Compartmentation and fire resistance periods
  • Detection, alarm and smoke control
  • Fire service access and facilities
  • External fire spread and wall build-ups
  • Fire strategy drawings (marked-up plans)
  • Engineered justifications where needed
  • Coordination with the design team

Fire strategy report fees

Fees depend mainly on the building's size and complexity, the RIBA stage and how much fire engineering analysis is needed. A straightforward change-of-use strategy is a very different job from a high-rise residential strategy for Gateway 2. We'll give you a fixed fee once we've seen the drawings – see our cost guide for what drives the price.

Where we work

Fire strategies are prepared for projects in London, Slough and Berkshire, and across the UK.

Guides on this topic

Related services

How it works

How a fire strategy is delivered

1

Tell us about the building

Height, use, what you already hold and what prompted the enquiry.

2

Scope & fixed-fee proposal

We confirm what's needed, who will do it, the fee and timescale.

3

Survey & assessment

Desktop review, site visit and any intrusive investigation needed.

4

Report & next steps

A clear report, prioritised actions and support with follow-up questions.

FAQs

Frequently asked questions

Is a fire strategy report a legal requirement?

There's no single law that says every building must have one, but in practice building control applications for new and altered buildings need fire safety information, higher-risk buildings need one for Gateway 2, and Regulation 38 requires fire safety information to be handed to the responsible person on completion. A fire strategy is the normal way of meeting all three.

What's the difference between a fire strategy and a fire risk assessment?

A fire strategy explains how the building is designed to be safe in a fire. A fire risk assessment checks how the building is being managed and maintained day to day, and is a legal duty under the Fire Safety Order. The FRA should be informed by the strategy.

Which guidance will my fire strategy follow?

Usually Approved Document B for simpler buildings, BS 9991 for residential buildings or BS 9999 for other buildings, with fire engineering (BS 7974) where a design goes beyond prescriptive guidance. We'll confirm which applies at the start.

Can you prepare fire statements for planning (Gateway 1)?

Yes. Planning applications for relevant buildings – 18m or 7 storeys or more with two or more dwellings – need a fire statement. It's best prepared alongside an outline fire strategy so the two are consistent.

More services

Other services

Retrospective fire strategies

For existing buildings with a missing, outdated or unreliable fire strategy – essential for safety cases, FRAs and acquisitions.

Find out more

Gateway One fire statements

Fire statements for Planning Gateway One and London Plan Policy D12 – prepared alongside an outline fire strategy so planning and building control line up.

Find out more

FRAEW / PAS 9980

Fire risk appraisals of external walls to PAS 9980:2026 – for blocks of flats, remediation decisions and funding applications.

Find out more

EWS1 forms

EWS1 assessments for blocks of flats where a lender or valuer has asked for one – signed by an appropriately qualified professional.

Find out more

Cladding remediation support

Funding applications, remediation project management and independent oversight of cladding and external wall works – from FRAEW to sign-off.

Find out more

Safety case reports

Safety case reports and evidence for higher-risk buildings – focused on how fire spread and structural risks are actually managed.

Find out more

Building Safety Act support

Gap analysis, golden thread, Gateway 1–3 and duty-holder support for owners, managing agents and developers.

Find out more

Fire safety due diligence

Building safety and fire safety due diligence for acquisitions, disposals and refinancing – clear red flags and cost risks.

Find out more

Peer review & expert witness

Independent third-party reviews of FRAEWs, EWS1 forms, fire strategies and safety cases, plus Part 35 expert witness support for fire safety disputes.

Find out more

Fire risk assessments

Fire risk assessments for blocks of flats, offices, shops, HMOs and commercial premises – by competent, certificated assessors.

Find out more

Fire door inspections

Quarterly and annual fire door checks for blocks of flats, plus surveys for commercial buildings – with a clear remedial schedule.

Find out more

Compartmentation surveys

Surveys of fire stopping, cavity barriers and service penetrations above ceilings, in risers and in roof voids.

Find out more

Premises information boxes

Secure information box contents, floor plans, building plans and external wall records for high-rise residential buildings under the Fire Safety (England) Regulations 2022.

Find out more

EV, solar & battery fire risk

Fire risk assessments for EV charging in car parks, rooftop solar PV, battery storage and e-bike storage – before you install and once systems are in use.

Find out more

Not sure which report you need?

Tell us what's prompted the question – a lender, insurer, the regulator or a purchase – and we'll point you to the right service.

Ask a question

Need a fire strategy for your project?

Send us the drawings and your programme and we'll come back with a fixed-fee proposal.

Call Get a proposal