Fire strategies, FRAEWs and Building Safety Act support – London, Berkshire and UK-wide

High-rise residential compliance

Premises information boxes and building plans

Everything a high-rise residential building needs for the fire service under the Fire Safety (England) Regulations 2022 – floor plans, a single-page building plan, the external wall record and the contents of the secure information box.

  • Floor plans & building plan
  • External wall record
  • Secure information box contents
  • Digital copies for the fire service

London, plus Slough, Reading, Windsor & Maidenhead, Bracknell & Wokingham – and UK-wide.

Request a proposal

Reply in 1 working day

Tell us about the building – we'll confirm what's needed and come back with a fixed-fee proposal.

We'll only use your details to respond to this enquiry and, where needed, share them with the specialist assigned to your project – see our privacy policy.

Prefer to talk? 020 8058 1692

  • Qualified specialists
  • Fixed-fee proposals
  • PAS 9980:2026 guidance
  • Higher-risk buildings
  • London & UK-wide

What the law requires

Since 23 January 2023, the Fire Safety (England) Regulations 2022 have required the responsible person for every high-rise residential building – at least 18 metres high or with 7 or more storeys – to provide the fire and rescue service with information it can use in an emergency. In summary, you must:

  • Install and maintain a secure information box on site, containing the responsible person's name and contact details and hard copies of the building and floor plans
  • Prepare up-to-date floor plans and a single-page building plan showing key firefighting equipment, and send electronic copies to the local fire and rescue service
  • Record the design and materials of the external walls, including the level of fire risk and any mitigation, and share it electronically with the fire service
  • Check lifts and key firefighting equipment monthly, and report faults not fixed within 24 hours
  • Install wayfinding signage that firefighters can read in low light or smoke

Since 6 April 2026, the building emergency evacuation plan required by the residential PEEPs regulations must also be shared with the fire service, with a copy placed in the secure information box where one is installed.

What we provide

We prepare the plans and records the regulations call for, in the formats your local fire and rescue service accepts. That usually means a site visit to confirm the as-built layout, measured or updated floor plans, a building plan showing firefighting equipment such as dry risers, firefighting lifts, smoke control and isolation points, and an external wall record drawn from your FRAEW or survey information.

We can also review an existing information box against the regulations and the industry code of practice, and set up a simple process for keeping the contents current when the building changes.

Keeping it up to date

The information is only useful if it's right on the night. Plans need updating after alterations, the external wall record after remediation, and the evacuation plan whenever arrangements change. We'll build the review dates into your fire safety management plan so nothing goes stale. See our guide to premises information box requirements.

What's included

  • Site visit to confirm the as-built layout
  • Floor plans for each storey
  • Single-page building plan with firefighting equipment
  • External wall record from FRAEW or survey data
  • Responsible person contact sheet
  • Secure information box contents check
  • Digital files in the fire service's format
  • Wayfinding signage review
  • Monthly lift and equipment check templates
  • Review schedule for updates

Fees

Fees depend on the number of storeys, whether accurate drawings already exist and whether an external wall record can be taken from an existing FRAEW. We'll confirm a fixed fee once we know what you hold – see the cost guide.

Where we work

Premises information box and plan packages are prepared for high-rise blocks across London, Slough and Berkshire.

Guides on this topic

Related services

How it works

How it works

1

Tell us about the building

Height, use, what you already hold and what prompted the enquiry.

2

Scope & fixed-fee proposal

We confirm what's needed, who will do it, the fee and timescale.

3

Survey & assessment

Desktop review, site visit and any intrusive investigation needed.

4

Report & next steps

A clear report, prioritised actions and support with follow-up questions.

FAQs

Frequently asked questions

Which buildings need a premises information box?

High-rise residential buildings – at least 18 metres high or with 7 or more storeys – containing two or more sets of domestic premises, under the Fire Safety (England) Regulations 2022.

What goes in a secure information box?

At minimum, the responsible person's name and contact details and hard copies of the floor plans and building plan. Since April 2026 a copy of the building emergency evacuation plan should go in too, where a box is installed.

Do the plans have to be sent to the fire service?

Yes. Electronic copies of the floor plans, building plan and external wall record must be shared with the local fire and rescue service, which sets its own format.

Can you use our existing drawings?

Yes, if they reflect the building as it is today. We check them on site and update anything that has changed.

More services

Other services

Fire strategy reports

Fire strategies for new builds, refurbishments and changes of use – for building control, the BSR and the golden thread.

Find out more

Retrospective fire strategies

For existing buildings with a missing, outdated or unreliable fire strategy – essential for safety cases, FRAs and acquisitions.

Find out more

Gateway One fire statements

Fire statements for Planning Gateway One and London Plan Policy D12 – prepared alongside an outline fire strategy so planning and building control line up.

Find out more

FRAEW / PAS 9980

Fire risk appraisals of external walls to PAS 9980:2026 – for blocks of flats, remediation decisions and funding applications.

Find out more

EWS1 forms

EWS1 assessments for blocks of flats where a lender or valuer has asked for one – signed by an appropriately qualified professional.

Find out more

Cladding remediation support

Funding applications, remediation project management and independent oversight of cladding and external wall works – from FRAEW to sign-off.

Find out more

Safety case reports

Safety case reports and evidence for higher-risk buildings – focused on how fire spread and structural risks are actually managed.

Find out more

Building Safety Act support

Gap analysis, golden thread, Gateway 1–3 and duty-holder support for owners, managing agents and developers.

Find out more

Fire safety due diligence

Building safety and fire safety due diligence for acquisitions, disposals and refinancing – clear red flags and cost risks.

Find out more

Peer review & expert witness

Independent third-party reviews of FRAEWs, EWS1 forms, fire strategies and safety cases, plus Part 35 expert witness support for fire safety disputes.

Find out more

Fire risk assessments

Fire risk assessments for blocks of flats, offices, shops, HMOs and commercial premises – by competent, certificated assessors.

Find out more

Fire door inspections

Quarterly and annual fire door checks for blocks of flats, plus surveys for commercial buildings – with a clear remedial schedule.

Find out more

Compartmentation surveys

Surveys of fire stopping, cavity barriers and service penetrations above ceilings, in risers and in roof voids.

Find out more

EV, solar & battery fire risk

Fire risk assessments for EV charging in car parks, rooftop solar PV, battery storage and e-bike storage – before you install and once systems are in use.

Find out more

Not sure which report you need?

Tell us what's prompted the question – a lender, insurer, the regulator or a purchase – and we'll point you to the right service.

Ask a question

Is your information box up to date?

Tell us about the building and we'll confirm what's needed and a fixed fee.

Call Get a proposal