Fire strategies, FRAEWs and Building Safety Act support – London, Berkshire and UK-wide

Guides

Fire safety guides

Clear, up-to-date answers on fire strategies, external walls, the Building Safety Act and day-to-day fire safety compliance – written for the people responsible for buildings.

8 guides

Fire strategies & design

Fire strategies for new and existing buildings, Gateway One and Gateway 2, second staircases, conversions and handover information.

Do I need a retrospective fire strategy?

When an existing building needs a fire strategy, what it contains, how it differs from a fire risk assessment, and the usual triggers.

3 min read Read the guide

Fire strategy vs fire risk assessment: what's the difference?

What each document does, the law behind each, who writes them, and how they should work together in your building.

3 min read Read the guide

BS 9994 (draft): the first British Standard for fire strategies

What the draft standard covers, its line on fire risk assessments, competence and existing buildings, and what to do before it's published.

3 min read Read the guide

Gateway 2 rejections: getting your fire strategy approved first time

Current BSR timescales, the common reasons applications are rejected or delayed, and how to prepare a fire strategy that gets through first time.

3 min read Read the guide

Second staircase rules for buildings over 18m: the 30 September 2026 deadline explained

The 30 September 2026 deadline, which schemes are caught, transitional arrangements, 'sufficiently progressed', and what it means for existing buildings.

3 min read Read the guide

Planning Gateway One: when you need a fire statement

Which schemes need a fire statement, what the form covers, who reviews it, London Plan D12 and how prior approval conversions are treated.

3 min read Read the guide

Regulation 38 and the fire and emergency file: what developers must hand over

What Regulation 38 requires, when the information must be handed over, what a good fire safety handover pack contains, and the higher-risk building rules.

3 min read Read the guide

Office-to-residential conversions: a fire safety checklist

What changes when offices become flats, the design checklist for developers, and what to check in an existing converted building.

3 min read Read the guide

6 guides

External walls, FRAEW & EWS1

PAS 9980 appraisals, EWS1 forms, the new cladding remediation duty and how remediation gets funded.

6 guides

Building Safety Act & higher-risk buildings

Higher-risk buildings, safety case reports, the golden thread and the duties of accountable persons.

8 guides

Fire risk assessments & compliance

Fire risk assessments, fire doors, compartmentation, residential PEEPs, premises information boxes and the documents every block should hold.

Residential PEEPs: what responsible persons must do since April 2026

Which blocks are covered since 6 April 2026, the step-by-step duties, PCFRAs, the building emergency evacuation plan and how often to review.

3 min read Read the guide

BS 9792:2025: what's changed for fire risk assessments in blocks of flats

The housing fire risk assessment code that replaced PAS 79-2: scope, what's changed, the link to assessor competence, and what to ask for.

3 min read Read the guide

Mandatory fire risk assessor certification: what's coming

What the 2026 consultation proposed, which buildings may be covered first, the likely timeline, and how to choose a competent assessor now.

3 min read Read the guide

Fire door inspection requirements for blocks of flats (Regulation 10)

Quarterly communal checks, annual flat entrance door checks, what to inspect, records to keep, and the most common defects.

3 min read Read the guide

Fire risk assessment types 1–4 explained (and when you need an intrusive one)

What Types 1, 2, 3 and 4 cover, when you need an intrusive or flat-access assessment, and how often an FRA should be reviewed.

3 min read Read the guide

Compartmentation surveys: when you need one and what they find

What compartmentation is, when a survey is needed, what's inspected, the defects surveys usually find and what happens next.

3 min read Read the guide

Fire safety documents checklist: what every block of flats should hold

What every block should hold, the extra records needed above 11m, at 18m+ and for higher-risk buildings, and how to keep it current.

3 min read Read the guide

Premises information boxes and building plans: what high-rise blocks must have

What goes in the secure information box, the plans the fire service needs, external wall records, monthly lift checks and wayfinding signage.

3 min read Read the guide

FAQs

About these guides

Who writes these guides?

The London Fire Safety Consultants team, drawing on current legislation, British Standards and official guidance. Each guide lists its sources and the date it was last reviewed.

Are the guides legal advice?

No. They're general information about the law and guidance in England. For advice on a specific building, get in touch.

How often are the guides updated?

Whenever the law, guidance or regulator's position changes. Each guide shows the date it was last reviewed.

Need advice on a specific building?

Tell us about the building and what's prompted the question – we'll confirm what's needed and a fixed fee.

Call Get a proposal