Regulation 38 reviews

A Regulation 38 review checks the fire safety information handed over when a building is completed, extended or changes use – so the responsible person can run the building safely, and gaps are fixed while the developer and design team are still around.

  • Handover packs checked against Regulation 38
  • Gap list and information requests
  • As-built fire strategy if needed
  • For developers and building owners

London, plus Hounslow, Slough, Reading, Windsor & Maidenhead, Bracknell & Wokingham – and UK-wide.

Request a proposal

Reply in 1 working day

Tell us about the building – we'll confirm what's needed and come back with a fixed-fee proposal.

We'll only use your details to respond to this enquiry and, where needed, share them with the specialist assigned to your project – see our privacy policy.

Prefer to talk? 020 8058 1692

  • Qualified specialists
  • Fixed-fee proposals
  • PAS 9980:2026 guidance
  • Higher-risk buildings
  • London & UK-wide

What Regulation 38 requires

Regulation 38 of the Building Regulations 2010 applies where building work involves the erection or extension of a building, or a material change of use, and the completed building will fall under the Regulatory Reform (Fire Safety) Order 2005. The person carrying out the work must give fire safety information to the responsible person no later than the date of completion, or the date of occupation if that's earlier.

That information covers the design and construction of the building and the services, fittings and equipment provided, so the responsible person can operate and maintain the building with reasonable safety. For higher-risk buildings, information is also handed over to the accountable person as part of the golden thread at completion.

What is a Regulation 38 review?

A Regulation 38 review is an independent check of that handover information. We compare what has been provided with what the responsible person actually needs, identify what's missing or inconsistent, and produce a clear list of information to request – or help assemble it, including an as-built fire strategy where none exists.

Who needs one

  • Developers and contractors who want to hand over a complete, defensible package at practical completion
  • Freeholders, managing agents and landlords taking on a newly completed, extended or converted building
  • Owners of recently completed buildings whose fire risk assessment keeps flagging missing design information
  • Purchasers and investors checking that a new asset comes with the fire safety information it should – see fire safety due diligence

What documents are required under Regulation 38?

The regulation doesn't list documents, but Approved Document B and industry guidance describe what a good handover contains. We check for:

  • The as-built fire strategy and fire strategy drawings
  • The evacuation strategy and how the alarm system supports it
  • Commissioning certificates and specifications for fire safety systems – detection and alarm, emergency lighting, smoke control, sprinklers, dry or wet risers and firefighting lifts
  • The cause-and-effect schedule for interlinked systems
  • Fire door and fire damper schedules
  • Fire-stopping and cavity barrier records, ideally with photographs taken before ceilings were closed up
  • External wall build-ups and the test evidence for the products used
  • Maintenance and testing requirements for each system
  • Any departures from guidance and the management assumptions the design relies on

Read more in our guide to Regulation 38 and the fire and emergency file.

What's included

  • Review of the handover pack and O&M manuals
  • Check against Regulation 38 and Approved Document B
  • Consistency check with drawings and the fire strategy
  • Gap list with priorities
  • Information request schedule for the developer
  • As-built fire strategy where none exists
  • Fire strategy drawings
  • Advice for the first fire risk assessment
  • Golden thread handover check for higher-risk buildings
  • Plain-English summary for the client

Regulation 38 review fees

Fees depend on the size and complexity of the building and on how complete the handover information is. A desktop review of a well-organised pack is quick; rebuilding missing information, or preparing an as-built fire strategy, takes longer. We confirm a fixed fee before you commit – see the cost guide.

Where we work

Regulation 38 reviews are carried out for buildings in London, Slough and Berkshire, and across the UK.

Related services

How it works

How a Regulation 38 review works

1

Tell us about the building

Height, use, what you already hold and what prompted the enquiry.

2

Scope & fixed-fee proposal

We confirm what's needed, who will do it, the fee and timescale.

3

Survey & assessment

Desktop review, site visit and any intrusive investigation needed.

4

Report & next steps

A clear report, prioritised actions and support with follow-up questions.

FAQs

Frequently asked questions

What is Regulation 38?

A requirement in the Building Regulations 2010 to give fire safety information about a building's design, construction, services and equipment to the responsible person on completion or occupation, where the Fire Safety Order will apply.

What documents are required under Regulation 38?

The regulation doesn't list them, but a good handover includes the as-built fire strategy and drawings, commissioning certificates for fire safety systems, the cause-and-effect schedule, fire door and damper schedules, fire-stopping and cavity barrier records, external wall information and maintenance requirements.

Who is responsible for providing Regulation 38 information?

The person carrying out the building work – in practice the developer or main contractor, with input from the design team and fire engineer.

What if the developer has already gone?

We can rebuild the essential information from drawings, surveys and site inspection, and prepare a retrospective or as-built fire strategy so the building can be managed safely.

More services

Other services

Fire strategy reports

Fire strategies for new builds, refurbishments and changes of use – for building control, the BSR and the golden thread.

Find out more

Retrospective fire strategies

For existing buildings with a missing, outdated or unreliable fire strategy – essential for safety cases, FRAs and acquisitions.

Find out more

Gateway One fire statements

Fire statements for Planning Gateway One and London Plan Policy D12 – prepared alongside an outline fire strategy so planning and building control line up.

Find out more

FRAEW / PAS 9980

Fire risk appraisals of external walls to PAS 9980:2026 – for blocks of flats, remediation decisions and funding applications.

Find out more

EWS1 forms

EWS1 assessments for blocks of flats where a lender or valuer has asked for one – signed by an appropriately qualified professional.

Find out more

Cladding remediation support

Funding applications, remediation project management and independent oversight of cladding and external wall works – from FRAEW to sign-off.

Find out more

Safety case reports

Safety case reports and evidence for higher-risk buildings – focused on how fire spread and structural risks are actually managed.

Find out more

Building Safety Act support

Gap analysis, golden thread, Gateway 1–3 and duty-holder support for owners, managing agents and developers.

Find out more

Fire safety due diligence

Building safety and fire safety due diligence for acquisitions, disposals and refinancing – clear red flags and cost risks.

Find out more

Peer review & expert witness

Independent third-party reviews of FRAEWs, EWS1 forms, fire strategies and safety cases, plus Part 35 expert witness support for fire safety disputes.

Find out more

Fire risk assessments

Fire risk assessments for blocks of flats, offices, shops, HMOs and commercial premises – by competent, certificated assessors.

Find out more

Fire door inspections

Quarterly and annual fire door checks for blocks of flats, plus surveys for commercial buildings – with a clear remedial schedule.

Find out more

Compartmentation surveys

Surveys of fire stopping, cavity barriers and service penetrations above ceilings, in risers and in roof voids.

Find out more

Premises information boxes

Secure information box contents, floor plans, building plans and external wall records for high-rise residential buildings under the Fire Safety (England) Regulations 2022.

Find out more

EV, solar & battery fire risk

Fire risk assessments for EV charging in car parks, rooftop solar PV, battery storage and e-bike storage – before you install and once systems are in use.

Find out more

Not sure which report you need?

Tell us what's prompted the question – a lender, insurer, the regulator or a purchase – and we'll point you to the right service.

Ask a question

Taking on a new building?

Send us the handover pack and we'll tell you what's missing – with a fixed fee before you commit.

Call Get a proposal